DryPack Installation
DryPack Installation Method
- Home
- Installation
- DryPack Installation
DryPack Installation :
- Remove 8" of dirt for pool deck installation (12” if driveway)
- Dump and screed 4" of lime-rock for pool deck installation (8” if driveway)
- Spray DryPack (Base Stabilizer) and rake to go deeper
- Compact after 15 minutes
- Mix Portland cement with sand and Anti Hydro and spread 2" thick
- If using regular small concrete pavers, lay them down then compact as you go;
If using large format of concrete pavers or natural stone, apply thin-set to the backside of the pavers before laying and compacting them
- Grout if desired or required
- Seal with penetrating water base Stone Sealer 70